Where should I write the description on a Change Order Subcontractor?

Write a short title in the Name field at the top of the change order, so that it appears in the table overview. Use Description on the lines for details.

Write the title or description at the top of the change order itself. It is then shown in the table overview. Use the description on each line for details.

How to do it

  1. Open the change order in Change Order Subcontractor.

  2. Write a short, descriptive title in the Name field at the top, and optionally more text in the Description field under More information.

  3. Add details per line in the Description column on the line.

  4. Save.

An open Change Order Subcontractor in AIMZ. 1 points to the Name field at the top, which is shown in the table overview, 2 to the Description field under More information, and 3 to the Description column on the lines, where you add details per line.

Good to know

  • If the description is only at line level, it is not shown in the table, and the overview becomes hard to read.

  • A good title makes it easier to find the change order again and to link it to a Change Order Client.

  • The same tip applies to Change Order Client.