Skip to main content

Can I add several production codes at once?

Yes. Use "+ Add" above the table in Prod. codes. Then you can add several lines and save them all at once.

Yes. Use + Add above the table in Prod. codes. Then you can add several lines and save them all at once.

How to do it

  1. Go to Prod. codes.

  2. Click + Add at the left above the table, next to Edit and the search field.

  3. Fill in number, name and budget (may be called Cost price estimate) on the new line.

  4. Add more lines in the same way.

  5. Save when you are done. All the lines are saved at once.

The Prod. codes table. 1 points to the + Add button above the table, next to Edit.

Good to know

  • If you only need to add one code, you can also use + Production code at the top right.

  • The budget can be 0 and filled in later.

  • If you are going to enter the whole chart of accounts or many codes, import from Excel is often the fastest.

Related questions

Did this answer your question?