Go to Prod. Codes and click + Production Code at the top right. Enter number, name and budget, and save. You can set the budget to 0 and fill it in later.
How to do it
Go to Prod. Codes.
Click + Production Code at the top right.
Enter number and name.
Enter a budget, or leave it at 0. The budget may be called Cost price estimate in your setup.
Save.
Good to know
You do not have to fill in the whole line at once. The budget can be entered later.
A production code that does not exist in the estimate gets a budget of NOK 0. If you enter a purchase or a cost on it, the remaining budget becomes negative.
If the budget is on a different production code, you move it with a transaction.
If you are going to enter many codes, it is faster to import them from Excel.

