Skip to main content

How do I edit or delete an expected addition?

Open the list of expected additions, check the line and choose Edit or Delete in the menu. In the dialog you change the amount and click Confirm.

Open the list of expected additions, click the checkbox to the left of the line and choose Edit or Delete in the menu.

How to do it

  1. Open the production code and select the Expected Addition tab to see the list. Don't click Add.

  2. Click the checkbox to the left of the line, and a menu opens.

  3. Choose Edit to change it, or Delete to delete the entry.

  4. Change the amount in the dialog and click Confirm.

The Expected Addition tab on a production code in AIMZ. 1 points to the Expected Addition tab, 2 to the checkbox to the left of the line that opens the menu, and 3 to the menu with the options Edit, + Change Order Subcontractor, + Purchasing and Delete.

Good to know

  • Look for duplicates, for example several lines with the same amount.

  • When you sign the contract an expected addition relates to, you should delete it or enter it in the contract. Otherwise the cost is counted twice.

  • If you want to preserve the history, you can instead add a new entry with the opposite sign.

Related questions

Did this answer your question?