Open the production code and go to the Expected Addition tab in the tab bar at the top. There you see all expected additions on the production code.
How to do it
Go to Prod. Codes and open the production code.
Select the Expected Addition tab at the top.
Review the list. The Link column shows what the item is linked to.
Good to know
The tab bar also has tabs such as General, Estimate, Invoice, Files and Change Orders.
From the list you can edit or delete items.
If you want to see expected additions for the whole project, use Expected Addition in the menu.

